Workers will use segment pavers. The use of snow shovels and snowblowers to clear sidewalks of accumulated snow. Walk behind salt spreaders used to apply ice melt after clearing of the snow.
Digging up to 1 foot deep to install stone base for patio installation. Carrying of pavers to install on the patio. Broom sweeping sand into the patio joints. Wheel barrel topsoil or decorative stone around the patio to complete.Basement remodeling would only consist of helping trained installer carry items in and out of the job. May only do a total of 10-40 hours on this if there is no snow work.
Shoveling snow; facility site walk, picking up litter when there is no snow on the ground. Parking lot repair, filling in any potholes that may appear during winter months to prevent hazards using a wheel barrel and bags of asphalt patch.
Employment period: Oct 1, 2026 – Apr 15, 2027